Hormann Docking Systems From SWGD Group - 13/04/16

Were proud to announce that we’ve just completed a full docking solution for Caterlink in Bodmin, Cornwall. This comprises off

  • Hormann Insulated Decotherm Roller Shutters with vision windows. 3 phase electrics
  • Hormann Flap Shelters to give a seal when lorries are docked
  • Hormann Telescopic dock levellers
  • Wheel Guides for correct alignment of lorries into the dock
  • Buffers to protect the building from reversing lorries.

Also on site are Hormann Steel door sets and other bigger Decotherm roller shutter doors!

All in all a top job thats enhancing Caterlinks efficiency and work flow.

Hormann Docking system
Hormann Docking system
Industrial doors and dock levellers
Industrial doors and dock levellers
Internal view of dock leveller and Decotherm
Internal view of dock leveller and Decotherm
Dock leveller being used with pallet truck
Dock leveller being used with pallet truck
SImple loading with dock leveller
SImple loading with dock leveller
Adjustable dock level for differing vehicle heights
Adjustable dock level for differing vehicle heights

IMG_6439 IMG_6438

Dock levellers in use
Dock levellers in use
Docked lorry on leveller
Docked lorry on leveller
Docked lorry and empty loading area
Docked lorry and empty loading area
Full Docking solution
Full Docking solution
Docked lorry into flap shelter being loaded
Docked lorry into flap shelter being loaded

 

© SWGD Group 2017 - Website by DWM